top of page

SIEVE ADDITION

Project Location: Missouri

Project Overview:

Addition of one sieve bottle to increase dehydration capacity at a 40MMGPY ethanol plant. Line tie-in work was performed during the spring shutdown and the project was complete by the end of fall.

bottom of page